Installation fee for duplex systems up to duplex 180

5.0

Highlights

The installation fee includes the standard installation* and commissioning of a Duplex water softening system up to a capacity of 180 m³ x °dH, including travel costs. Without filter installation.
incl. VAT excl. shipping costs
Available - Installation by appointment within 1 to 2 days

Kapazität der Anlage

bis 240 m³ x °dH

€750.00

bis 300 m³ x °dH

€900.00

Your advantages only with us

  • Excellent expertise
  • Highest quality in every component
  • Fair price-performance ratio
  • In-house, trained fitters
  • No risk through purchase on account (from 500 €)
  • Free shipping in Germany (from 250 €)

Installation fee for duplex systems up to Duplex 80Installation fee for duplex systems up to Duplex 300Installation fee for duplex systems up to Duplex 500Installation fee for duplex systems up to Duplex 1000Installation fee for duplex systems up to Duplex 2000
sku801.1000.102MONDUK300MONDUK500MONDUK700MONDUK2000
Categories

The installation fee includes the standard installation* and commissioning of a Duplex water softening system up to a capacity of 180 m³ x °dH, including travel costs. Without filter installation.
* Standard installation: Estimated installation time up to 5 hours. If the installation time is extended due to unforeseen local circumstances, each additional hour will be charged at 100 euros. Additional materials, such as piping or laying of sewage, will be charged separately on site.

The installation fee includes:
- 5 hours of wages: Net 420.17 ¤, plus 19% VAT 79.83 ¤, gross 500 ¤
- Travel fee of: Net 84.03 ¤, plus 19% VAT 15.97 ¤, gross 100 ¤
- Material and operating resources (flat rate) in the amount of: Net 126.05 ¤, plus 19% VAT 23.95 ¤, gross 150 ¤

The flat rate only applies under the following conditions:
1. After the water meter/water filter there is approx. 30 cm of straight pipe (horizontal or vertical)

2. There is a freely accessible parking space for the system in the immediate vicinity of the above-mentioned line (see dimensions)
3. In the same room there is a freely accessible sewage pipe
4. There is a power connection in the immediate vicinity of the facility’s parking space

Any conversion work and additional materials will be charged separately. Please note that our fitters are not permitted to carry out any work on your electrical installation.

You will usually receive a binding installation date within 4 to 6 weeks. Please note that if you miss the appointment or cancel late (without a valid reason), we reserve the right to charge 100 euros for travel costs plus any waiting time.


Compatible with

5.0

5 Stars (1)
4 Stars (0)
3 Stars (0)
2 Stars (0)
1 Star (0)
The reviews were verified as follows: Customers receive a link to rate the products. This is an individualized link that only consumers who have actually purchased the goods or services from us receive.

Latest Reviews

5.00
Christian v.
Dec 6, 2021
The system has only been in use for a few weeks. An...
The system has only been in use for a few weeks. A final assessment is only possible after a longer period of use.
show all Reviews


You may also be interested in